Importing external files

Import

Your processes already exist.
Bring them in.

BPMN files from other tools, drawings from Visio, project plans from MS Project: one button in Process Studio – and the file becomes a model you can keep working with.

How it works

Three sources. One button. One model.

You choose the file – TAOM recognises by itself what it is. For Visio and MS Project, a selection window shows what was read before a model is created.

BPMN
BPMN filefrom another tool
VSDX
Visio drawingflowchart or swimlanes
XML
Project plan from MS Projectsaved as XML
In Process StudioLoad BPMN / Visio / MS Project

The button is on the start page of Process Studio.

ResultA model in Process StudioWith lanes, steps and arrows – ready to work on.
You see it beforehandThe selection window gives numbers: steps, lanes and connections – or tasks, summary tasks and milestones.
Visio and MS Project stay with youTAOM reads these files in your browser. The file itself does not leave your computer – what is saved is the finished model.
After that, it is a TAOM modelEdit it, place it in the enterprise process model, check it, test it and read it in the Viewer – like any other model.
The three ways

What becomes of your file.

Each source brings something different. That is why TAOM reads each one in its own way.

BPMN 2.0 · .bpmn / .xml

The flow arrives as it was drawn.

For models from other BPMN tools.

  • Pools, lanes, steps, events, gateways and arrows – in their place
  • Colours, descriptions and text annotations are read
  • TAOM extensions are kept if the file comes from TAOM
Visio · .vsdx

The drawing becomes a process model.

For flowcharts and swimlane drawings.

  • Shapes become steps, decisions and events – connectors become arrows and keep their route
  • If the file has several pages, each selected page becomes a model of its own
  • You assign unclear shapes after the import: as a shape, as a device at the step, as a note – or as no longer relevant
  • Colours, fonts and pictures are not taken over. Save older .vsd files as .vsdx in Visio first
To the video “Importing Visio files” →
MS Project · XML

The plan becomes linked models.

For project plans – saved in MS Project via “File › Save As › XML”.

  • The first model shows the phases of the plan, with one model per phase below – large phases are divided further
  • Tasks become steps, milestones become events, dependencies become arrows
  • Lanes come from workstream, team or resource
  • Planned work, progress, notes and responsible persons are at the step
To the video “Importing MS Project plans” →
At a glance

What comes along?

BPMNVisioMS Project
Steps and arrowsas drawnfrom shapes and connectorsfrom tasks and dependencies
Lanespools and laneslanes of the drawingworkstream, team or resource
Several modelsone model per fileone model per pagelinked models per phase
Description at the stepis readnot in the drawingfrom the note of the task
Times––planned work, lead time, progress
Responsible persons––if maintained in the plan
Devices–as a device at the step–
Coloursare readnot taken over–
Licencesee the feature matrixanyone can try it; full use from Webuser Profrom Webuser Pro

Trying it out means: import twice and look at the result. Saving, exporting and the agent are part of the Webuser Pro licence.

What each licence includes: to the feature matrix →
What matters

The import translates. It invents nothing.

The more clearly the source is structured and the more completely it is maintained, the better the model. What is not in the file will not appear in TAOM.

From the file

What it brings along

  • flow, lanes and names
  • from project plans also times, notes and responsible persons
  • names stay as they are in the file
From the agent

What it proposes

  • a description for each step where there is none
  • the translation into German, English, French and Spanish
  • marked as AI-generated – your own text stays your text
  • whether it may work is defined for each classification
From you

What you add

  • place in the enterprise process model and classification
  • system, device, risk and control at the step
  • start, end and transitions – guided by the yellow signs
After the import

From the imported picture to a managed process.

1PlaceA place in the enterprise process model, an identifier for every step.
2CloseYellow signs show open ends: set an end, link it or note it.
3EnrichThe agent describes and translates – you check and complete.
4ValidateRisk and control, test case, process test and manual.
5ReadIn the Viewer for everyone: flow, marks, risks and reporting.
See for yourself

Four videos – from import to the finished model.

Each video is also available as a course in TAOM Training – no sign-in needed, with subtitles.

Learning video · 7 minutes

Importing Visio files

From a Visio drawing to a checked process model – using the example of a high-bay warehouse.

Open the course in TAOM Training →
Learning video · 4 minutes

Enriching imported models

The agent writes the description – the model becomes a test, and the test becomes a manual.

Open the course in TAOM Training →
Learning video · 5 minutes

Importing MS Project plans

From project plan to process model – using an S/4HANA project based on SAP Activate.

Open the course in TAOM Training →
Learning video · 2 minutes

Open ends – the yellow sign

What the yellow sign on a step means – and what you can do.

Open the course in TAOM Training →
Try it with a file of your own.You can try a Visio drawing without a licence – twice, to look at.

More on this: Enterprise process model → · Bite-sized, not wallpaper → · AI in the process model →