Home / TAOM™ Requirements Analysis

TAOM™ Requirements Analysis

Solution · Requirements Analysis

Requirements lose their rationale during a project. That is the real problem.

They emerge in workshops, end up in a list, move into the ticketing system – and eventually nobody remembers which business need they were meant to address. TAOM preserves the connection to the Process Step, Role, and System from which the Requirement originated.

Refinement

A Requirement is not simply written – it is refined

Between “we need a validation” and an implemented field lie eight stages. Project disputes rarely arise from the requirement itself; they arise where ownership of the next refinement stage is unclear.

From the Process Step through Business and Functional Requirements, System Context, Development Object, and Specifications to the Delivery Object – with the responsible Role at each stage.

The value

The question that comes two years later

Eventually, someone asks why a particular field exists, whether a validation is still necessary, or what happens if an Enhancement is removed.

Trace backward from a field in the System through Delivery Object, Requirement, and Process Step to the Business Objective.

What a Requirement is connected to

Six relationships that remain intact

Process

The process in which it is needed.

Activity

The exact Process Step where it originated.

Role

Who needs it and who is accountable for it.

System

Which Application must fulfill it.

Business Objective

What it contributes to.

Development Context

What is built from it – through to its WRICEF classification.

This is the difference between a requirements list and connected Requirements Management: A spreadsheet knows the ID, Title, and Priority. A connected model also knows the origin – and can therefore answer questions a spreadsheet cannot.

Where Requirements come from

Most Requirements begin as findings during Process Discovery

What emerges in a workshop

  • 01Missing System FunctionalityWhat the System cannot do and therefore has to be worked around.
  • 02WorkaroundsThe spreadsheet beside the System without which the process does not work.
  • 03Integration GapsData that has to be transferred manually.
  • 04Compliance Obligations and EvidenceWhat someone handles alongside the process without it being formally documented.
  • 05Data IssuesFields and data that nobody fully trusts.

No break in context

These findings emerge during Process Discovery – and remain connected to the Process Step where they were identified.

Discovery → Finding → Requirement → Delivery therefore becomes one connected flow rather than a handover between separate tools.

What it produces

Traceable all the way through Acceptance

  • 01Business RequirementsWhat the business needs, expressed in business language.
  • 02Functional RequirementsWhat the System must provide to meet that need.
  • 03WRICEF ObjectsWorkflow, Report, Interface, Conversion, Enhancement, Form.
  • 04Functional and Technical SpecificationsRequired behavior and technical implementation, both connected to the same origin.
  • 05User StoriesFor teams that work this way – while preserving the same source context.
  • 06Acceptance CriteriaThe criteria used to determine whether the Requirement has been fulfilled.
About integration, transparently: Issue Type, Priority, Status, Component, Version, and Responsibility are stored with the element – preparing the handover to Jira. Continuous synchronization is not currently available. Details under Integrations.

Typical use cases

Where this is applied

  • 01Transformation InitiativesWhen many Requirements emerge simultaneously and quickly lose their context.
  • 02Fit-to-Standard Follow-upTurn every identified Gap into a Requirement with its business rationale preserved.
  • 03Legacy System ReplacementDetermine which existing characteristics are genuinely required by the business and which are merely historical.
  • 04Audit PreparationDemonstrate why a Control exists and where it applies.
  • 05Handover to DeliverySpecifications that carry the business rationale into implementation.
  • 06Testing and AcceptanceValidate against the underlying business need, not merely against the specification document.

Getting started

Start with a Requirement that is currently disputed

Take one where nobody can clearly explain anymore why it was written that way. Connect it to the Process Step from which it originated – and see how much clearer the discussion becomes.